The Sault Canal was designed with emergency planning in case lock gates failed and unleashed water from Lake Superior through the lock, and the Dominion Bridge Company of Montreal built an all-steel emergency swing bridge dam, based on an American prototype, with 23 iron wickets that could be lowered into the canal on metal frames to reduce water flow. It was tested on 9 June 1909 when the Perry G. Walker rammed the lower gates while the passenger ship Assiniboia and the ore carrier Crescent City were entering the lock downbound. The released water tore out the lock's main gates, and the vessels and their anchors ripped planking from the lock floor, tore up submarine cables, and damaged the lock sill as they were carried out of the lock. The emergency swing bridge dam was swung into place, its wickets were lowered, and the flow of water was reduced so the auxiliary gates could be closed and the lock repaired. The canal was operational only 12 days later. The design's success led to its use on the Panama Canal and other waterways, and this nationally significant engineering work is one of the last surviving emergency swing bridge dams of its type in the world.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free
FIND IT
Ontario · Canada
NEARBY MARKERS
Sault Ste. Marie Ship Canal
Science & Tech
The Sault Canal / Le canal du Sault
Transportation
The All Canadian Waterway (1895-1959) / La voie navigable entièrement canadienne (1895-1959)
Transportation
A National Historic Site at the Sault / Un lieu historique national au Sault
Science & Tech
Baawaating — the Place of the Rapids / Baawaating — le lieu des rapides
History
Equality and Multiculturalism / Égalité et multiculturalisme
History