Transportation
Work on a causeway and canal complex between Cape Breton Island and mainland Nova Scotia began in 1953 under a tri-party agreement between the federal Department of Transport, the Nova Scotia Department of Highways and Canadian National Railway. T.C. Gorman (Nova Scotia) Ltd. was chosen as general contractor to construct the canal, and O.J. MacCulloch Engineers Ltd. of Montreal was responsible for design and project management. A suspension bridge or a canal through Archie's Pond on the mainland side of the Strait was considered, but Balache Point, also known as MacMillan Point, just off Port Hastings, was selected for economic reasons. Construction of the causeway diverted an enormous amount of water with a strong current through the canal's 24.4 metre-wide opening, making tidal locks necessary for ships to pass safely. The canal was built to be 250 m long, 24.4 m wide and 9.8 m deep at low tide, and it was designed to be compatible with the St. Lawrence Seaway, able to pass a ship 224 m in length with a draft not exceeding 8.5 m.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free
FIND IT
Nova Scotia · Canada
NEARBY MARKERS
History of the Canso Canal / Historique du Canal de Canso
Transportation
Operation of the Canso Canal / Exploitation du Canal
Transportation
The Building of the Canso Causeway / La Construction de la Levée de Canso
Science & Tech
Canso Causeway
Transportation
Balache Point Lighthouse
Transportation
Grandique Point Lighthouse
Transportation
