Fukushima Daiichi units 4, 5, and 6 were shut down when the Fukushima Daiichi disaster began on 11 March 2011 after the Tōhoku earthquake and tsunami, yet they still faced serious difficulties. Unit 4 became the main concern because all 548 fuel assemblies had been moved to its elevated spent fuel pool before the disaster, and fears grew over rising heat, falling water levels, and a 15 March explosion that heavily damaged the building’s upper section. Emergency crews improvised cooling measures while engineers reinforced the structure and restored cooling. Units 5 and 6 had comparatively minor damage but also required close monitoring because their cooling systems initially struggled.