Nature
3
Restoration of Strawberry Island required careful planning to protect sensitive environmental conditions while rebuilding the island with natural-looking materials that could also resist erosion. Excavated river sediments had to be strictly contained to prevent silt damage to nearby aquatic habitats. Phase III was designed to avoid significantly affecting regional water levels, because altering the island's shape could influence the hydrology of the Niagara River and Lake Erie, so planners conducted an extensive study using data from multiple points along both waterways before adding rocks and wetland soils. Imported wetland soils had to be free of invasive plants such as purple loosestrife and giant reed, and leftover soil from a nearby Buckhorn Island State Park wetland enhancement project was used to encourage native plant growth. Since the restoration effort began in 1993, more than 18,000 cubic yards of wetland soil and rock have been added to Strawberry Island. Phase I breach repair was completed in 1993, Phase II shoreline stabilization in 1997, and Phase III wetland restoration in 2002. Rocks and plants protect the island from waves, willows and cottonwood trees help stabilize its soil, young plants must be protected from being eaten, the central bay provides important bird and fish habitat, and shoreline plants can thrive in newly created wetlands.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free
FIND IT
Grand Island, New York · United States
