Hamilton Dock was filled at high tide and emptied at low tide. Getting a ship into the dry dock for repairs or fit out was a difficult operation that required considerable coordination. Keel blocks were arranged in a bed according to a docking plan for each ship. The dock was filled with water, and the caisson was pumped empty and floated out. The ship was guided into the dock and moored over the keel blocks. The caisson was then floated back into position, filled with water, and sunk into its slot to plug the mouth of the dock. A diver inspected the position of the keel blocks before the ship came to rest on them. The ship was held steady by adjusting the mooring ropes, and it gently lowered into position as the dock was pumped dry.