Science & Tech
Constructed during the reign of King Ahab in the 9th century BCE, this water system was designed to supply the inhabitants of the city with water in times of siege. A vertical shaft was dug through earlier occupation layers, and at its bottom a sloping tunnel was hewn to reach ground-water at a depth of approximately 40 meters. Hazor’s timeline includes Canaanite Hazor (Greater Hazor) from 1720 to 1100 BCE, spanning Middle Canaanite Period IIb and Late Canaanite Period until the destruction of Canaanite Hazor in 1250 BCE, followed by an occupational gap from 1250 to 1100 BCE, and Israelite Hazor from 1100 to 732 BCE, including Israelite Period I from 1100 to 950 BCE and Israelite Period IIa from 950 to 850 BCE, before Israelite Period IIb from 850 to 732 BCE, from the reign of Ahab to the destruction of the Kingdom of Israel.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free
FIND IT
North District · Israel
