Science & Tech
Newcastle Swing Bridge was completed in June A.D. 1876 at the cost of the Tyne Improvement Commission. In 1876 the commission consisted of life commissioners James C. Stevenson M.P., John Dryden, William R. Hunter, and Addison Potter; members elected by the Corporation of Newcastle upon Tyne, Thomas Ridley, chairman, William L. Harle, William Hunter, Benjamin Plummer, Henry Milvain, and Richard Gail; members elected by the Corporation of Gateshead, Richard W. Hodgson and John M. Redmayne; members elected by the Corporation of Tynemouth, John R. Proctor, Edward Shotton, and George Bell; members elected by the Corporation of South Shields, John Robinson, John B. Dale, and Matthew Stainton; and members elected by dues payers, John Morrison, William A. Potter, William W. Pattinson, Matthew Cay, Ralph P. Philipson, and James Craig. The secretary was James Guthrie. The mayors of the represented corporations were William H. Stephenson of Newcastle upon Tyne, William Galloway of Gateshead, William A. Potter of Tynemouth, and John Broughton of South Shields. The foundations, piers, abutments, and the whole of the masonry of the bridge were constructed by the Tyne Commissioners’ engineering staff, and the iron superstructure and machinery by Sir W.G. Armstrong and Co. John F. Ure was chief engineer and Philip J. Messent acting engineer. The bridge stands on the site previously occupied by the Stone Bridge erected in 1778, where the boundary stone between Newcastle and Gateshead was situated at a point 316 feet south of this tablet.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free
FIND IT
England · United Kingdom
