TRANSPORTATION · HISTORICAL MARKER

Water Control Dams/Port Severn – The Secondary Lock

Muskoka District, Ontario
· Barrages de régularisation des eaux/Port Severn – L’écluse secondaire
Transportation
1
A complex system of dams was needed to control water levels for navigation on the lower Severn River, and in many cases older timber structures built by loggers were replaced with concrete. Contracts for a dam and lock at Port Severn were let in 1913. Because it was intended to carry only local traffic between Matchedash Bay and Gloucester Pool, the lock was only 7 m. wide and 30 m. long, smaller than other locks on the system. It opened in 1915. The canal's main route was to follow Little Go Home Bay to a lock providing access to Georgian Bay through the South Bay of Honey Harbour, but work on that section began in 1919 and was never completed. The lock at Port Severn was then declared the official northern terminus and has served boaters ever since.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free

FIND IT

Ontario · Canada
Muskoka District, Ontario
COUNTY · 15 STOPSExplore Muskoka District, Ontario
Hear every story as you drive
4.7 Stars · 800+ Ratings
Hear this story on the road