TRANSPORTATION · HISTORICAL MARKER

Evolution of a Railway / Evolution d’un ber roulant

Transportation
1
Big Chute’s first marine railway was built in 1917 on the Trent Canal system to overcome one of the final obstacles to navigation. Intended at first as only a temporary boat transfer system while conventional locks were planned, it was almost completely rebuilt in 1923-24 to carry larger boats, with a much bigger railway car, a new control building, new motors and winches, improved landing facilities, and a rebuilt track. Construction on dams, two locks, and a lagoon began in 1919, but the project ended in 1921 because of the post-war recession, leaving the canalworks unfinished. The railway remained essentially the same afterward except for minor upgrades and a new control building in 1969. By the 1960s and 1970s, increasing boat traffic on the Waterway had created a bottleneck that the old railway could no longer handle. Although a lock seemed ideal, it would have allowed lamprey access to the Lake Simcoe fishery, so a larger and more technologically advanced railway was chosen instead. Construction began in 1976, and the new marine railway was operating by 1978, while the older railway continued in service as a standby when repairs were needed.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free

FIND IT

Ontario · Canada
Muskoka District, Ontario
COUNTY · 15 STOPSExplore Muskoka District, Ontario
Hear every story as you drive
4.7 Stars · 800+ Ratings
Hear this story on the road