Transportation
1
Tunnel No. 2 on the Guernsey-Wendover Cutoff was located directly beneath this highway bridge. More than 1,900 feet long, it was the second of three tunnels on the nine-mile cutoff constructed by the Chicago, Burlington and Quincy Railroad in 1914-1915. The cutoff allowed trains to haul twice the tonnage, so the tunnels were built as quickly as possible, and this one was completed in a record three months. The Burlington’s Tunnel No. 2 was a single-bore, timber-lined tunnel, 1,928 feet long. It was one of three tunnels within a five-mile stretch of the cutoff that maintained an even grade along the steep, rocky canyon cut by the North Platte River. Crook and Young were the contractors for Tunnels No. 1 and 2, employing a large crew of men who lived in temporary camps near the tunnels. They used drilling and blasting methods to bore through both tunnels, with drills run by three large air compressors powered by steam boilers and water supplied to the boilers by a pipeline from the North Platte River. All three tunnels were completed by the end of 1915. Tunnel No. 1, about 1.4 miles to the southeast, is 3,333 feet long and took eight months to complete, while Tunnel No. 3, about 3.3 miles to the northwest, is 1,441 feet long. Periodic maintenance and repairs allowed these tunnels to function for more than 80 years. However, because of structural roadbed problems, Tunnel No. 2 was removed, and its former location is evident by the deep cut under the bridge. The Burlington Northern and Santa Fe Railway Company continues to run freight through Tunnels 1 and 3, hauling low sulfur coal from the Powder River Basin.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free
FIND IT
Wyoming · United States
