SCIENCETECH · HISTORICAL MARKER

The St. Clair Tunnel / Le Tunnel St. Clair

Science & Tech
6
Built in 1889-1891 to link the Canadian mainline of the Grand Trunk Railway with Chicago, the St. Clair Tunnel was the first subaqueous tunnel in North America and one of the great engineering feats of the 19th century. The tunnel is 1,837 metres long with a 6-metre bore. Canadian engineer Joseph Hobson designed and supervised its construction, using an innovative combination of cutting shield excavation, cast iron tunnel lining, and compressed air to break the transportation bottleneck caused here and elsewhere by the impossibility of tunnelling through soft riverbeds.
Hear stories like this as you drive
ExploreHere reads historical markers out loud as you pass them: over 325,000 stories across the US. No account needed.
4.7 · 800+ ratings · Free

FIND IT

Ontario · Canada
Lambton County, Ontario
COUNTY · 43 STOPSExplore Lambton County, Ontario
Hear every story as you drive
4.7 Stars · 800+ Ratings
Hear this story on the road